1000m+ Trackway Roads

Grassform Group have just finished assembling over 1000 meters of Trackway access across 4 farmers fields and 3 electricity pylons so that local contractors can get access to the pylons to replace the insulators and carry out electrification works in the remote area.

Grassform Group has just finished assembling over 1000 meters of Trackway access across 4 farmers fields and 3 electricity pylons so that local contractors can get access to the pylons to replace the insulators and carry out electrification works in the remote area.

As you can see this is a very tight route with limited access. Working alongside the local forestry commission we planned the access and had the route cut back so a safe access could be designed and laid safely by us. This access will now have huge cranes and lorries driving over it for the next 4 weeks and will stand up to the harsh winter conditions throughout the entire project.

Due to the flexibility of our Trackway system, we have designed several 45 degree and 90 degree turns as well as roadways, passing bays and crane pads.

If you are planning a project like this in a remote location please do not hesitate to contact us and we will be delighted to help plan the access requirements.

Why not contact us now for free advice on your upcoming project?

Contact Us



Clients

View all
Brochure Request

Sign up to download our latest brochure

Want to look at our full range of products? Please fill out your details below and a copy of our latest brochure will begin downloading.
  • This field is for validation purposes and should be left unchanged.