Battersea Power Station

Grassform has secured a contract to reinforce the access grounds around Battersea power station.

With the amount of traffic driving in and out of Battersea Power Station, even the stone roads cannot hold up! Having been in negotiations for many months, I was beginning to wonder if id ever secure the order, but persistence paid off and I am proud to announce that Grassform have successfully been appointed to work alongside some of the main contractors inside the station and reinforce the roadways, using our very own temporary Trackway panels! We have worked through the night and successful installed thousands of square meters of temporary area using a variety of our panels, to create compound areas and temporary roadways over the existing surface.

Our Trackway will help disperse the weights of the thousands of lorries a day driving over it, easing the pressure going into the ground and enabling it to last much longer. These will remain on hire for 2 years and only require a maintenance visit every few months to keep them in good working order!

There are a number of other areas we must now look at reinforcing, but this just goes to show even the hardest surfaces will eventually need reinforcing. So even if your planning on taking a great number of heavy loads over playgrounds, concrete surfaces or other hard standing areas, please think of the benefits our Trackway can provide.

Why not contact us now for free advice on your upcoming project?

Contact Us



Clients

View all
Brochure Request

Sign up to download our latest brochure

Want to look at our full range of products? Please fill out your details below and a copy of our latest brochure will begin downloading.
  • This field is for validation purposes and should be left unchanged.