Case Study

Lightning Damaged Pylon Repair

A rapid response project to allow a crane to get to a damaged pylon urgently to repair the damage.

After lightning had struck the power cables on this National Grid tower, it was urgent that a crane could get access to it to repair the damage. Our rapid response was essential and we have laid the entire temporary access required by National Grid in less than 1 day.

The access consisted of several roadways measuring hundreds of linear meters along with a huge pad area for the crane to position itself and make the required repair works to the frayed cables.

The first image below shows the initial temporary roadway we have installed from the entrance gate and right across a farmers ploughed field.

The second image shows the pad area that the crane will sit on to enable the cables to be repaired.

Why not contact us now for free advice on your upcoming project?

Contact Us



Clients

View all
Brochure Request

Sign up to download our latest brochure

Want to look at our full range of products? Please fill out your details below and a copy of our latest brochure will begin downloading.
  • This field is for validation purposes and should be left unchanged.